by Alina Zhuravel | Sep 29, 2022 | Detroit - District 6, Downtown Midtown Neighborhoods, Empowering Detroit, Reliability Work Updates, Wayne County
DTE crews were out in Downtown Detroit, near Third and Howard Streets, to modernize equipment that powers the historic, 97-year-old Buhl Building. Our team worked in a manhole to replace an underground cable with a new one. This update improves the durability of the...
by Alina Zhuravel | Sep 29, 2022 | Macomb County, Reliability Work Updates
DTE contractor crews recently worked in Center Line to replace an old power pole, located near Wainwright and Pershing Streets, with a new one. As time goes on, poles can deteriorate from normal wear and tear, especially during turbulent weather. New pole...
by Alina Zhuravel | Sep 29, 2022 | Detroit - District 6, Downtown Midtown Neighborhoods, Empowering Detroit, Reliability Work Updates, Wayne County
DTE crews were recently out in Detroit, near Second Avenue and Peterboro Street, making upgrades to the electric grid. Our team replaced an existing net bank with a brand-new one, upgraded with a higher voltage capacity. As energy use evolves over time, updates like...
by Alina Zhuravel | Sep 26, 2022 | Macomb County, Reliability Work Updates
DTE contractor crews were recently in Warren, near East 10 Mile Road and Hesse Avenue, making updates to the electric grid. Our team replaced an old pole with a brand-new one and upgraded it with higher quality equipment. This work will improve the durability of our...
by Alina Zhuravel | Sep 26, 2022 | Oak Park, Oakland County, Reliability Work Updates
Oak Park residents may have recently noticed an orange “workers ahead” sign placed near Jerome Street and Oak Park Boulevard. This signifies that tree trimmers were in your neighborhood working to improve your reliability. Our team trimmed multiple tree limbs back...